← Back to the Garage

GARAGE LE MANS · VARESE

Our Story.

The origins of Garage Le Mans,
in the heart of Varese.

Illustrative black-and-white reconstruction of a 1960s FIAT workshop, with cars, mechanics and large windows.

AI-generated illustration based on the supplied photographs, inspired by a FIAT workshop in the 1960s.

Open image

01 · THE BEGINNINGS

From a workshop,
in the heart of Varese.

Garage Le Mans is the original name of the workshop opened around the 1960s, the first officially authorised FIAT workshop in the province of Varese.

02 · FROM FIAT TO HERTZ

A new road.

In the 1980s, the workshop became a Hertz car rental depot, with room for hundreds of cars inside.

The premises were later closed and abandoned, left unused for years and becoming a storage depot.

Illustration of the Hertz depot: Italian cars from the 1980s in two rows inside Garage Le Mans.

AI-generated illustration based on the supplied photographs, inspired by the Hertz depot in the 1980s.

Open image
Boxes, materials and objects accumulated inside Garage Le Mans. An interior passage with an Accettazione sign and stacked metal structures. Old washbasins and deteriorated surfaces in the abandoned premises. The workshop interior with its inspection pit and materials stored on the floor. A room in Garage Le Mans with wall coverings, floor openings and materials to be removed. Red shelving with original FIAT spare-parts signs. Boxes and materials gathered between the Garage's columns. Rubble and removed wall coverings during the renovation.
The Garage during the period of abandonment. Select a photo to open the complete original.

03 · THE YEARS OF ABANDONMENT

Abandonment.

After more than 20 years of inactivity and disuse, Garage Le Mans became a storage space for objects and cars, in a state of severe neglect and decay.

04 · A NEW BEGINNING

Rebirth.

Garage Le Mans was sold to a property company with an ambitious, one-of-a-kind idea.

The project was to restore Garage Le Mans and create a home for an R/C modelling enthusiasts' club.

Renovation began in 2021: demanding work in the middle of the COVID pandemic.

View of the Garage premises with vehicles and construction materials. Installing new glazed door and window frames at the Garage entrance. Freshly painted ceilings and walls, with equipment and paint containers inside. Work on the opening towards the courtyard, with metal supports above the passage. Work on the Garage floor using a tool and dust extractor. The interior during painting, with mobile scaffolds, ladders and building materials.
The 2021 renovation works. Select a photo to open the complete original.
Installing new glazed frames along the Garage facade. Work on the exterior roof during renovation. Assembling the large door panels inside the Garage. Preparing the door components in the room with chequered walls. Painting the interior, with ladders, equipment and paint containers. Work on the facade above the Garage Le Mans sign.
Work at Garage Le Mans. Select a photo to open the complete original.

05 · THE WORKS

The works.

Work, which began in 2021, continues without a break, with dozens of people contributing to the ambitious project.

Installers, electricians, technicians, builders, plumbers and painters have worked for more than two years.

06 · DURING THE WORKS

Memorable moments.

Countless unforgettable moments occurred during the renovation.

One was the little bird that decided to build a nest on the very door that was due to be removed a few days later.

People went to great lengths to keep working while building a temporary home for the new family.

The nest built above the Garage's large door. Eggs in the nest during the renovation. The temporary home fixed to the wall to house the nest. The little bird in the nest inside its temporary home. The chicks in the nest inside the temporary home.
The nest, the temporary home and the chicks. Select a photo to open the complete original.

07 · THE GARAGE TODAY

Our numbers

Garage Le Mans comes back to life in an underground building of 1,400 m², built entirely in SCC reinforced concrete.

Facilities

  • 22 km of electrical cabling installed
  • 35 kW of installed power at 400 V
  • 20 kVA for the emergency UPS system
  • 27 kW for the diesel backup generator
  • 108 LED lamps illuminating the entire building

Network and technology

  • 12.8 GB/s Internet connection through three providers: Optical Fiber, Fibercop and Starlink
  • 6 Wi-Fi access points at 2,400 Mbps, with free Wi-Fi
  • 3 + 6 servers and PCs serving the R/C track
  • 11 monitors installed in the building
  • 2 AMB transponders installed and connected to the Internet

Space and access

  • 1,400 m² total building area, built entirely in SCC reinforced concrete
  • 50 seats at equipped tables
  • 8 driving positions on the rostrum
  • 31 surveillance cameras active 24 hours a day
  • 3 entrances with turnstiles and facial recognition

Safety

  • 12 fire extinguishers: 8 gas and 4 powder
  • 2 high-pressure fire hoses
  • 2 smoke detection systems
  • 1 flood detection system
  • 2 automatic floodwater pumps
  • 4 emergency doors with panic bars
  • 3 emergency exits, including 2 with upward stairways
  • 2 first aid cabinets
  • 1 semi-automatic AED defibrillator — not yet operational (end of 2026)

Thank you to the 179 friends who support the track today!